Search Now!
Contact Info
Location #G1, Ground floor, AVA Heritage, Pachaiyammai nagar, Gerugambakkam, Chennai.
Follow Us

TWAD Water Treatment & Utility Systems Project

Images

TWAD Water Treatment & Utility Systems Project

This project focused on electrical and mechanical support for a major water treatment and storage facility developed under TWAD infrastructure expansion. The work included electrical panel installation, machinery wiring, equipment positioning, and site-level testing.

Heavy equipment such as treatment units, transformers, and pumping assemblies were installed and integrated with structured electrical systems. The execution required coordination with mechanical contractors and on-site engineering teams to ensure correct alignment and operational safety.

The project was successfully completed with compliance to industrial electrical standards, ensuring reliable performance, operational safety, and long-term system durability.


Gallery

Image
Image
Image
Image
Image

Project Info

Client
TWAD Board
Location
Tamil Nadu
Sector
Public Utility / Water Supply
Service
Electrical Installation, Equipment Integration & Testing

Need Support?

Call Our Experts +91 85508 78888